top of page
SPECIALIST
PLUMBING INSTALLATION

Existing floor pipework
Floor screed completed before tap selection.

Specialist floor breakout
Left-side screed cut carried out with underfloor heating pipework identified in advance using thermal imaging.

Mounting base preparation
Structural base installed to provide stable fixing for the tap.

Structural mounting base
Mounting base precisely levelled to ensure correct tap alignment.

Installation secured
Pipework protected against corrosion prior to screed reinstatement.

Final installation complete
Floor-mounted bath tap installed, aligned and fully commissioned.
bottom of page
